• Television
  • Editorial
  • Personality
  • Style
  • Echoes of the Past
  • Press Clip
  • Column
    • Capital Matters
    • Eye Witness
    • Frank Talk
    • Insights
    • Naija Gists
  • Download Magazine
    • View Cart
  • Television
  • Editorial
  • Personality
  • Style
  • Echoes of the Past
  • Press Clip
  • Column
    • Capital Matters
    • Eye Witness
    • Frank Talk
    • Insights
    • Naija Gists
  • Download Magazine
    • View Cart
  • Home
  • News
    • National
    • International News
  • Politics
  • Education
  • Business
  • Entertainment
  • Sports
  • Health
  • Law
  • Shop
  • Home
  • News
    • National
    • International News
  • Politics
  • Education
  • Business
  • Entertainment
  • Sports
  • Health
  • Law
  • Shop
Download Magazine
FG orders TCN to cut power supply to Benin Republic, Togo, Niger
  • May 7, 2024
  • Unity Times

The Federal Government has ordered a department within the Transmission Company of Nigeria (TCN), the System Operator (SO), to cut power supply to three neigbhouring customers to six per cent in order to improve domestic power supply.

The three countries affected are the Niger Republic, Benin Republic, and Togo.

Grow your business with us

The electricity regulator, the Nigerian Electricity Regulatory Commission (NERC), gave the order in a letter dated April 29, 2024, jointly signed by the commission’s Chairman, Sanusi Garba, and Vice Chairman, Musiliu Oseni.

The effective date for the order is May 1, 2022.

The directive, outlined in a document titled ‘Interim Order on Transmission System Dispatch Operations, Cross-border Supply, and Related Matters,’ will only last for six months, subject to change.

According to the document, power delivery to Nigeria’s neighbours must not exceed six percent of the total grid electricity at any given time.

The electricity sector regulator expressed concern about sub-optimal grid dispatch practices, which have impacted the ability of Distribution Companies (DisCos) to meet their service tariff commitments to end-users.

“The reliance on limiting Discos’ load off-take while prioritising international off-takers and Eligible Customers has proven neither efficient nor equitable,” the document read.

NERC stressed that the current international and bilateral contracts with Generation Companies (GenCos) often fall short of industry standards.

It stated that many off-takers contracted bilaterally by GenCos exploit this prioritisation, exceeding their contracted levels during peak operations without penalties.

As an interim measure, NERC said the move was targeted at guiding the system operator and TCN in implementing Standard Operating Procedures to enhance transparency and fairness in grid operations.

The order also called on the system operator to place interim caps on capacities supplied to international customers for the next six months, minimising the impact on domestic supply obligations by Gencos.

The document stated that the system operator must develop and present a pro-rata load-shedding scheme to ensure equitable load allocation to all off-takers (Discos, international customers, and eligible customers) during generation drops or grid imbalances.

“The system operator will log and publish hourly readings, enforcing penalties for violations of grid instructions and contracted nominations. Maximum load allocation to international off-takers in each trading hour shall not exceed six percent of the total available grid generation.”

It partly read, “The commission hereby orders as follows: The system operator shall develop and present to the commission for approval within seven days from the issuance of this order a pro-rata load-shedding scheme that ensures equitable adjustment to load allocation to all off-takers—DISCOs, international customers, and eligible customers—in the event of a drop in generation and other under-frequency related grid imbalances necessitating critical grid management.

“The system operator shall implement a framework to log and publish hourly readings and enforce necessary sanctions for violation of grid instructions and contracted nominations by off-takers in line with the grid code and market.

“The aggregate capacity that can be nominated by a generating plant to service international off-takers shall not be more than 10 per cent of its available generation capacity unless in exceptional circumstances a derogation is granted by the commission.“The system operator shall henceforth cease to recognise any capacity addition in bilateral transactions between a generator and an off-taker without the express approval of the commission,” it added.

It urged, “The system operator and TCN to immediately initiate and install integrated Internet of Things (IoT) meters at all off-take and delivery points of eligible customers, bilateral supplies, cross-border trades, and outgoing 33kV feeders of the Discos to provide real-time visibility of aggregate offtake by grid customers.

“The installation of and streaming of data from the IOT meters should be completed within three months from the date of this order.”

Previous
Next
Share the Post:
Grow your Business
Grow your business with Us
Subscription Ads
Related Posts

Dangote Refinery denies mass sack of staff

Management of Dangote Petroleum Refinery and Petrochemicals has denied the allegation by the Petroleum and Natural Gas Senior Staff Association

Read More

Court directs NMA to verify Nnamdi Kanu’s health status

THE Federal High Court (FHC) in Abuja has directed the Nigerian Medical Association (NMA) to set up a team of

Read More

NUC announces nationwide recruitment, opens application portal

The National Universities Commission (NUC) has announced the commencement of a nationwide recruitment exercise to fill several vacancies at its

Read More

Join Our Newsletter

Unity Times
Facebook-f Twitter
  • Dangote Refinery denies mass sack of staff

    Dangote Refinery denies mass sack of staff

    September 26, 2025 Breaking News, Business, Naija Gists, National, News
  • Court directs NMA to verify Nnamdi Kanu’s health status

    Court directs NMA to verify Nnamdi Kanu’s health status

    September 26, 2025 Breaking News, Health, National, News
  • NUC announces nationwide recruitment, opens application portal

    NUC announces nationwide recruitment, opens application portal

    September 26, 2025 Breaking News, Education, National, News
Get In Touch

Block 4, Wuse ll,

Abuja Nigeria

  • Email: office@unitytimesonline.com
  • Phone:
  • Hours: Mon-Fri 9:00AM - 5:00PM

© 2025 All Rights Reserved.