Skip to content
  • Television
  • Editorial
  • Personality
  • Style
  • Echoes of the Past
  • Press Clip
  • Column
    • Capital Matters
    • Eye Witness
    • Frank Talk
    • Insights
    • Naija Gists
  • Download Magazine
    • View Cart
  • Television
  • Editorial
  • Personality
  • Style
  • Echoes of the Past
  • Press Clip
  • Column
    • Capital Matters
    • Eye Witness
    • Frank Talk
    • Insights
    • Naija Gists
  • Download Magazine
    • View Cart
logo11_prev_ui
  • Home
  • News
    • National
    • International News
  • Politics
  • Education
  • Business
  • Entertainment
  • Sports
  • Health
  • Law
  • Shop
  • Home
  • News
    • National
    • International News
  • Politics
  • Education
  • Business
  • Entertainment
  • Sports
  • Health
  • Law
  • Shop
Download Magazine
World Bank Targets 90 Million Nigerians In Push For Electricity And Digital Access
  • August 21, 2026
  • Unity Times
World-Bank (1)

Power deficit and weak broadband remain major barriers to Nigeria’s productivity ambitions

ABUJA — For millions of Nigerians, two modern necessities remain frustratingly unreliable: electricity and internet access.

Grow your business with us

That reality has placed energy and digital connectivity at the centre of Nigeria’s development agenda, with the World Bank continuing to support programmes aimed at expanding electricity access and strengthening the country’s digital infrastructure.

The scale of Nigeria’s electricity challenge is enormous. The World Bank estimates that approximately 90 million Nigerians — about 45 per cent of the population — lack access to the electricity grid, giving Nigeria the world’s largest absolute electricity-access deficit.

Even Nigerians connected to the grid frequently contend with unreliable supply.

The World Bank estimates that unreliable electricity costs the Nigerian economy the equivalent of 5–7 per cent of GDP annually, as businesses increasingly depend on generators and other forms of self-generation.

Electricity is an economic issue

The electricity crisis is not merely about whether households can switch on a light.

For a Nigerian entrepreneur, unreliable electricity means diesel. For a manufacturer, it means higher production costs. For a student, it means studying under difficult conditions. For a hospital, it can become a matter of life and death. For a digital entrepreneur, poor electricity and weak broadband can make it impossible to participate competitively in the global economy.

This is why electricity and broadband increasingly need to be treated as productive infrastructure, not simply public utilities.

Nigeria’s digital gap

The World Bank has also highlighted significant weaknesses in Nigeria’s broadband infrastructure.

Its country diagnostic notes that only a fraction of international bandwidth arriving in Lagos is distributed across the country, while Nigeria needs substantial expansion of its fibre infrastructure. It also identifies a significant rural-urban digital divide.

That divide has serious implications for education, healthcare, financial inclusion, remote work, e-commerce and artificial intelligence.

The bigger development challenge

Nigeria’s population is growing rapidly. That means the country must connect millions of new citizens every year simply to prevent the existing access gap from widening.

The World Bank’s earlier electricity programmes have explicitly identified Nigeria as having the largest absolute electricity-access deficit globally, while supporting reforms designed to improve reliability and attract private investment.

The challenge now is implementation. Nigeria does not lack development plans. What Nigerians increasingly want to see is delivery.

About The Author

Unity Times

See author's posts

Previous
Next
Share the Post:
Grow your Business
Grow your business with Us
ads
Subscription Ads
Related Posts
US Military2 (1)

US ENDS TWO-DECADE MILITARY PRESENCE IN IRAQ AS TROOPS COMPLETE WITHDRAWAL

Unity Times Foreign Desk The United States has formally ended its military mission in Iraq, completing a withdrawal

Read More
Super-Eagles8 (1)

Super Eagles Stunned 3–0 by Guinea-Bissau in AFCON Qualifier

UNITY TIMES SPORTS DESK Nigeria’s Super Eagles suffered a painful setback in their 2027 Africa Cup of Nations

Read More
Nigerian-National-Assembly-1 (1)

2025 Capital Budget Gets Fourth Extension as National Assembly Moves Deadline to December 31

UNITY TIMES POLITICAL DESK The National Assembly has approved another extension of the implementation period for the capital

Read More

Join Our Newsletter

logo11_prev_ui
Unity Times
Facebook-f Twitter
  • US ENDS TWO-DECADE MILITARY PRESENCE IN IRAQ AS TROOPS COMPLETE WITHDRAWAL

    US ENDS TWO-DECADE MILITARY PRESENCE IN IRAQ AS TROOPS COMPLETE WITHDRAWAL

    September 30, 2026 Breaking News, International News, Security
  • Super Eagles Stunned 3–0 by Guinea-Bissau in AFCON Qualifier

    Super Eagles Stunned 3–0 by Guinea-Bissau in AFCON Qualifier

    September 30, 2026 Breaking News, National, News, Sports
  • 2025 Capital Budget Gets Fourth Extension as National Assembly Moves Deadline to December 31

    2025 Capital Budget Gets Fourth Extension as National Assembly Moves Deadline to December 31

    September 30, 2026 Breaking News, National, News, Politics
Get In Touch

Block 4, Wuse ll,

Abuja Nigeria

  • Email: office@unitytimesonline.com
  • Phone:
  • Hours: Mon-Fri 9:00AM - 5:00PM

© 2026 All Rights Reserved.