Skip to content
  • Television
  • Editorial
  • Personality
  • Style
  • Echoes of the Past
  • Press Clip
  • Column
    • Capital Matters
    • Eye Witness
    • Frank Talk
    • Insights
    • Naija Gists
  • Download Magazine
    • View Cart
  • Television
  • Editorial
  • Personality
  • Style
  • Echoes of the Past
  • Press Clip
  • Column
    • Capital Matters
    • Eye Witness
    • Frank Talk
    • Insights
    • Naija Gists
  • Download Magazine
    • View Cart
logo11_prev_ui
  • Home
  • News
    • National
    • International News
  • Politics
  • Education
  • Business
  • Entertainment
  • Sports
  • Health
  • Law
  • Shop
  • Home
  • News
    • National
    • International News
  • Politics
  • Education
  • Business
  • Entertainment
  • Sports
  • Health
  • Law
  • Shop
Download Magazine
Tinubu flags-off NNPCL’s 1.350 megawatt power project in Abuja
  • August 4, 2023
  • Unity Times
NNPC-GCEO-Mele-Kyari-and-Bola-Tinubu (1)

President Bola Tinubu on Friday flagged off the Gwagwalada Independent Power Plant Project of the Nigerian National Petroleum Company Limited (NNPCL).

UNITY TIMES learnt that the Power Project is a 1.350MW combined cycle power plant with auxiliaries and a balance of plant to be situated on 547 hectares of land already acquired at Gwagwalada, in the Federal Capital Territory (FCT), Abuja.

Grow your business with us

The project is expected to generate between $ 700 and $ 800 million annually within the first ten years of operations.

It was necessitated by the need to deliver gas towards additional power generation capacity in Nigeria. Gas supply to the plant shall be through the Ajaokuta- Kaduna-Kano (AKK) Gas Pipeline Project which is currently in the advanced stages of construction.

Accordingly, the fuel requirements will be satisfied under a long-term Gas Sales, Purchase and Aggregation Agreement with Shell Petroleum Development Company Joint Venture (SPDC JV).

The project consists of three power train blocks of 450MW each.

Each block will include two General Electric GT13E2 gas turbine generators, two heat recovery steam generators, one steam turbine electric generator, one direct air-cooling condenser, a balance of plant equipment and a black start diesel generator.

On completion, the project will generate an average of 10.3 million Megawatt hours of electricity per year for sale to the Nigerian Bulk Electricity Trading Plc (NBET).

The sales of the generated power will be through Power Purchase Agreement with the NBET to distribution companies under long-term agreements and direct sales to major off-takers.

China Machinery Engineering Corporation will construct the project under a turnkey Engineering, Procurement and Construction contract.

The ground-breaking event was attended by the Group Chief Executive Officer of the NNPC Limited, Mele Kyari; the Permanent Secretary of the Ministry of Petroleum Resources, Gabriel Aduda and his counterpart in the FCT Olusade Adesola, among other top dignitaries in the private and public sectors.

About The Author

Unity Times

See author's posts

Previous
Next
Share the Post:
Grow your Business
Grow your business with Us
ads
Subscription Ads
Related Posts
US Military2 (1)

US ENDS TWO-DECADE MILITARY PRESENCE IN IRAQ AS TROOPS COMPLETE WITHDRAWAL

Unity Times Foreign Desk The United States has formally ended its military mission in Iraq, completing a withdrawal

Read More
Super-Eagles8 (1)

Super Eagles Stunned 3–0 by Guinea-Bissau in AFCON Qualifier

UNITY TIMES SPORTS DESK Nigeria’s Super Eagles suffered a painful setback in their 2027 Africa Cup of Nations

Read More
Nigerian-National-Assembly-1 (1)

2025 Capital Budget Gets Fourth Extension as National Assembly Moves Deadline to December 31

UNITY TIMES POLITICAL DESK The National Assembly has approved another extension of the implementation period for the capital

Read More

Join Our Newsletter

logo11_prev_ui
Unity Times
Facebook-f Twitter
  • US ENDS TWO-DECADE MILITARY PRESENCE IN IRAQ AS TROOPS COMPLETE WITHDRAWAL

    US ENDS TWO-DECADE MILITARY PRESENCE IN IRAQ AS TROOPS COMPLETE WITHDRAWAL

    September 30, 2026 Breaking News, International News, Security
  • Super Eagles Stunned 3–0 by Guinea-Bissau in AFCON Qualifier

    Super Eagles Stunned 3–0 by Guinea-Bissau in AFCON Qualifier

    September 30, 2026 Breaking News, National, News, Sports
  • 2025 Capital Budget Gets Fourth Extension as National Assembly Moves Deadline to December 31

    2025 Capital Budget Gets Fourth Extension as National Assembly Moves Deadline to December 31

    September 30, 2026 Breaking News, National, News, Politics
Get In Touch

Block 4, Wuse ll,

Abuja Nigeria

  • Email: office@unitytimesonline.com
  • Phone:
  • Hours: Mon-Fri 9:00AM - 5:00PM

© 2026 All Rights Reserved.